Retrofit of the Sprinkler System in the High-Bay Warehouse

High-bay warehouse in Hünfeld with converted sprinkler system to NFPA/FM
  • Deliverables:
    • Project Management
    • Construction Management
    • Construction Safety Management
    • Constructability Reviews
    • Cost Control
    • Quality Assurance
    • Defect Management
    • Interface Management
    • Facility Management
  • Location: Hünfeld
  • Period: 2010-2013
  • Owner: Wella Grundstücks- und Vermögensverwaltungs GmbH & Co. KG

In a high-bay warehouse featuring seven aisles, each 100 m long, with heights between 21 m and 25 m, and a total capacity for 16,000 pallets, the existing sprinkler system from the 1970s, which was executed according to VdS guidelines, was converted to the NFPA/FM Corporate Standard. The project included the complete deconstruction of the old system and the installation of a new sprinkler system with flue and face sprinklers, as well as a completely new ceiling protection system. The sprinkler piping grid was designed for high reliability and supplied by two separate sprinkler manifolds, ensuring that 50% operational capacity remains available in the event of one manifold failing. The entire conversion was carried out aisle-by-aisle in a phased execution (two aisles simultaneously) to avoid interrupting continuous operation and material availability. The work was performed in close coordination with the logistics department during ongoing production. This required the erection of industrial scaffolding inside the racks. The entire retrofit measure was completed without accidents.