Extension of a Fire Service Main according NFPA 24
- Deliverables:
- Project Management
- Construction Management
- Construction Safety Management
- Constructability Reviews
- Cost Control
- Quality Assurance
- Defect Management
- Interface Management
- Documentation Management
- Facility Management
- Location: Hünfeld
- Period: 2010-2013
- Owner: Wella Grundstücks- und Vermögensverwaltungs GmbH & Co. KG
To meet Corporate Standards, the existing fire water supply at the site needed to be expanded from lateral lines to a redundant looped fire service main in accordance with NFPA 24. The project included connecting the newly constructed second pump house to the fire service main loop. In total, over 1,000 m of new fire service main was installed. The piping was executed using FM-certified HDPE pipes. To avoid disrupting ongoing production traffic at the site, a large portion of the installation was realized using the directional drilling method (trenchless installation). Hydrants were installed at strategic points on the fire service main, and Post-Indicator-Valves (PIV) were installed on the shut-off valves at the intersection points. Furthermore, new building entry points were created at two existing buildings for the connection of future sprinkler manifolds.