Beckmann Engineering & Consulting Logo - Stefan Beckmann

Projekte

Extension of a Fire Service Main according NFPA 24

Extension of a Fire Service Main according NFPA 24 at the Hünfeld site
  • Deliverables:
    • Project Management
    • Construction Management
    • Construction Safety Management
    • Constructability Reviews
    • Cost Control
    • Quality Assurance
    • Defect Management
    • Interface Management
    • Documentation Management
    • Facility Management
  • Location: Hünfeld
  • Period: 2010-2013
  • Owner: Wella Grundstücks- und Vermögensverwaltungs GmbH & Co. KG

To meet Corporate Standards, the existing fire water supply at the site needed to be expanded from lateral lines to a redundant looped fire service main in accordance with NFPA 24. The project included connecting the newly constructed second pump house to the fire service main loop. In total, over 1,000 m of new fire service main was installed. The piping was executed using FM-certified HDPE pipes. To avoid disrupting ongoing production traffic at the site, a large portion of the installation was realized using the directional drilling method (trenchless installation). Hydrants were installed at strategic points on the fire service main, and Post-Indicator-Valves (PIV) were installed on the shut-off valves at the intersection points. Furthermore, new building entry points were created at two existing buildings for the connection of future sprinkler manifolds.

Inquire Project
Beckmann Engineering & Consulting Logo
View all projects Contact Imprint
© 2025-2026 Stefan Beckmann | BECKMANN Engineering & Consulting