Construction of Raw Material Tanks with special Fire Protection Requirements

Construction of raw material tanks with special fire protection requirements
  • Deliverables:
    • Project Management
    • Permitting Management
    • Construction Management
    • Construction Safety Management
    • Constructability Reviews
    • Cost Control
    • Quality Assurance
    • Defect Management
    • Interface Management
    • Facility Management
  • Location: Hünfeld
  • Period: 2011-2012
  • Owner: Wella Grundstücks- und Vermögensverwaltungs GmbH & Co. KG
  • Contractor: Baugeschäft Pabst, Dermbach
  • Process Equipment: AAR GmbH, Magdeburg

As part of a production changeover for raw material delivery, the construction of two heated raw material tanks for the storage of so-called fatty alcohols was necessary. The product is classified as a flammable liquid. Due to internal fire protection regulations, the tanks had to be secured by surrounding reinforced concrete walls designed to prevent fire spread to adjacent buildings. The arrangement of the walls considered the flame spread angle. To reduce the construction height of the containment structure and prevent structural load transfer to adjacent structures, the reinforced concrete structure was founded on a deeper level. Additionally, the concrete structure had to comply with the stringent requirements of the Water Resources Act (WHG). The product tanks themselves were also protected by a canopy. The actual erection of the tanks and their integration into the production process were carried out by a specialized plant and apparatus construction contractor.