Remediation of a Production Building – chloride-contaminated Concrete Structure

Refurbishment of a production building with chloride-contaminated concrete structure
  • Deliverables:
    • Project Management
    • Permitting Management
    • Construction Management
    • Construction Safety Management
    • Cost Control
    • Quality Assurance
    • Interface Management
    • Structural Integrity Surveillance
  • Location: Hünfeld
  • Period: 2012-2018
  • Owner: Wella Grundstücks- und Vermögensverwaltungs GmbH & Co. KG

A production building dating from the 1960s, whose structural system is made of reinforced concrete, showed severe corrosion phenomena, particularly in the area of the exterior columns and an internal building separation joint. An investigation by an expert for damage to reinforced concrete structures identified chloride-containing aggregate (Werrakies) as the cause of the concrete damage. Since the structural integrity of the building could not be conclusively guaranteed in the short term, immediate strengthening measures were required. These included the installation of steel columns on the exterior wall and a steel frame in the area of the damaged building separation joint, which were intended to provide support in the event of failure of the primary reinforced concrete components. Additionally, the load-bearing capacity of the building was reduced, and detailed load plans were created for each floor. A canopy with cantilever beams had to be demolished as its structural integrity could not be secured through load redistribution. In coordination with the Certifying Structural Engineer, a test plan was developed that stipulated a regular condition assessment of the structural system, allowing the limited utilization period of the building to be extended by two years at a time. After no further damage occurred over a period of about five years, a comprehensive concept for the permanent remediation of the structural system was developed by another engineering firm, based on additional concrete investigations. The subsequent extensive concrete remediation of the damaged reinforced concrete components led to the lifting of the temporary use restriction. Upon completion of the measures, the construction authority granted permission for the unlimited continued use of the building.