Installation of a Container-Gasfiller for Aerosols
- Deliverables:
- Permitting Management
- Construction Management
- Construction Safety Management
- Quality Assurance
- Interface Management
- Facility Management
- Location: Hünfeld
- Period: 2012
- Owner: Wella Grundstücks- und Vermögensverwaltungs GmbH & Co. KG
To expand aerosol production capacity, a new gas-filling unit was installed outside the existing production building. This project was efficiently excuted using containerized construction avoiding extensive modifications for explosion protection within the existing building. The scope of work included constructing the necessary foundations and fully integrating building services, ventilation systems, and the sprinkler system.