Construction of a Production Building for Hair Cosmetic Filling Lines

New construction of a production hall for hair care filling lines in Hünfeld
  • Deliverables:
    • Project Management
    • Permitting Management
    • Construction Management
    • Construction Safety Management
    • Constructability Reviews
    • Cost Control
    • Quality Assurance
    • Defect Management
    • Interface Management
    • Facility Management
  • Location: Hünfeld
  • Period: 2011-2013
  • Cost: approx. €3.5 million
  • Owner: Wella Grundstücks- und Vermögensverwaltungs GmbH & Co. KG
  • General Contractor: Fleischmann, Tann

To increase production efficiency, Procter & Gamble constructed a new production hall for shampoo and conditioner filling lines at the Hünfeld site between 2012 and 2013. The single-story building, with a floor area of 2,750 m² and a clear height of 6.30 m, was executed as a reinforced concrete skeleton structure on a 16×16 m grid. Due to the demanding soil conditions, Constructability Reviews were performed during the planning phase, which led to a reduction in foundation costs by approximately 45%. The foundation utilized continuous flight auger piles with pile caps and tie beams, and the backfills were stabilized using geotextile. A notable feature is the fire wall with 180 minutes of fire resistance to adjacent buildings. The hall is equipped with a central ventilation system and a comprehensive sprinkler system.