Fire water containment with WHG coating and fire water barriers in Hünfeld
  • Deliverables:
    • Definition of Scope
    • Quantity Determination
    • Retention Volume Calculation
    • Definition of Measures
    • Construction Management
    • Construction Safety Management
    • Interface Management
  • Location: Hünfeld
  • Period: 2016
  • Owner: Wella Grundstücks- und Vermögensverwaltungs GmbH & Co. KG
  • Floor Coating: Colorböden Vertriebsgesellschaft mbH
  • Containment Barriers: THOMAS SYS TECH GmbH

Due to the storage of significant quantities of water pollutants belonging to Water Hazard Classes WGK 1 to WGK 3, the implementation of extensive fire water retention measures was required. Initially, a detailed scope definition was conducted, which included an inventory of the stored water-pollutant raw materials and their respective quantities. Based on this data, specific fire water retention measures were defined for various operational areas and subsequently realized through construction. This implementation included, among other things, the execution of coating works and the installation of manual and automatic fire water barriers connected to the fire alarm system.In addition to the stationary systems, the plant and the plant fire brigade were additionally equipped with mobile fire water retention equipment.

Inquire Project
Beckmann Engineering & Consulting Logo
View all projects Contact Imprint
© 2025-2026 Stefan Beckmann | BECKMANN Engineering & Consulting