Beckmann Engineering & Consulting Logo - Stefan Beckmann

Projekte

Construction of the Women’s and Juvenile Detention Facility, Munich

New construction of the women's and juvenile detention facility in Munich, Stadelheimer Straße
  • Deliverables:
    • Structural Shell Construction Supervision
    • Precast Element Design Coordination
    • Precast Element Shop Drawing Review
    • Constructability Reviews
    • Defect Management
  • Location: Munich
  • Period: 2007
  • Cost: approx. €25 million
  • Owner: SüdLeasing GmbH über Roberto GVG
  • General Contractor: BAM Deutschland AG

The construction of the Women’s and Juvenile Detention Facility with a total of 220 detention places on Stadelheimer Straße was the first Bavarian PPP Project (public-private-partnership). The complex is divided into a Women's Section with 160 detention places, including 10 mother-and-child places, and a Juvenile Facility with 60 detention places (46 male, 14 female). Due to the inner-city location, the building walls simultaneously serve as the perimeter wall. Large-format translucent surfaces create bright areas inside without allowing external communication. Simultaneously, the structure allows space for generous open spaces with green and sports areas in the exercise yards.

Inquire Project
Beckmann Engineering & Consulting Logo
View all projects Contact Imprint
© 2025-2026 Stefan Beckmann | BECKMANN Engineering & Consulting