Construction of the Women’s and Juvenile Detention Facility, Munich
- Deliverables:
- Structural Shell Construction Supervision
- Precast Element Design Coordination
- Precast Element Shop Drawing Review
- Constructability Reviews
- Defect Management
- Location: Munich
- Period: 2007
- Cost: approx. €25 million
- Owner: SüdLeasing GmbH über Roberto GVG
- General Contractor: BAM Deutschland AG
The construction of the Women’s and Juvenile Detention Facility with a total of 220 detention places on Stadelheimer Straße was the first Bavarian PPP Project (public-private-partnership). The complex is divided into a Women's Section with 160 detention places, including 10 mother-and-child places, and a Juvenile Facility with 60 detention places (46 male, 14 female). Due to the inner-city location, the building walls simultaneously serve as the perimeter wall. Large-format translucent surfaces create bright areas inside without allowing external communication. Simultaneously, the structure allows space for generous open spaces with green and sports areas in the exercise yards.