Beckmann Engineering & Consulting Logo - Stefan Beckmann

Projekte

Construction of the Correctional Facility Frankfurt am Main I

New construction of the Frankfurt am Main I correctional facility in Preungesheim
  • Deliverables:
    • Tendering & Contract Award
    • Construction Supervision
    • Claims Management
    • Defect Management
    • Documentation Management
  • Location: Frankfurt am Main - Preungesheim
  • Period: 2008-2010
  • Cost: approx. €73 million
  • Client: Hessisches Ministerium der Justiz vertreten durch Hessisches Baumanagement (HBM)
  • General Contractor: Consortium: BAM Deutschland AG & ED. Züblin AG

The Frankfurt am Main I Correctional Facility (JVA) was constructed as a Remand Prison of the highest security level with a total capacity of 564 detention places. The new construction comprises seven buildings ranging from three to five stories, with one to two basement levels. The buildings also contain workshop, leisure, sports, multipurpose, and pastoral care areas. An infirmary with 34 nursing beds is available. Additionally, the administration and a transport department with 56 detention places are accommodated within the complex. Supplementary works included the realization of a new perimeter wall, demolition and securing measures, a garage facility, an emergency power supply system, conversions of existing structures, as well as the remediation of the southwest wall and extensive exterior grounds.

Inquire Project
Beckmann Engineering & Consulting Logo
View all projects Contact Imprint
© 2025-2026 Stefan Beckmann | BECKMANN Engineering & Consulting