New Fire Pump House with a 2,500 gpm Diesel Pump and a 40,000 gallon Fire Water Tank

New Fire Pump House with a 2,500 gpm Diesel Pump and a 40,000 gallon Fire Water Tank for fire protection in Hünfeld
  • Deliverables:
    • Project Management
    • Construction Management
    • Construction Safety Management
    • Constructability Reviews
    • Cost Control
    • Quality Assurance
    • Defect Management
    • Interface Management
    • Documentation Management
    • Facility Management
  • Location: Hünfeld
  • Period: 2011-2012
  • Owner: Wella Grundstücks- und Vermögensverwaltungs GmbH & Co. KG

To meet the Corporate Standard, a second redundant pump house was erected, along with the associated fire water tank. The new unit comprises a fire water tank with a storage volume of 1,500 m³ and a separate pump house. The pump house was realized in the form of a precast garage and houses a diesel pump with a capacity of 2,500 gallons per minute (9,500 lpm). The entire pump unit was delivered and installed as a pre-assembled Pump Skid according to NFPA 20 guidelines. The fire water tank was erected on a monolithic base plate and designed as a bolted tank. Assembly was modular, with the tank elements pre-assembled on the ground and subsequently raised into the final position using a Jacking System.