Construction of an Unloading Containment Pad for Liquid Raw Materials
- Deliverables:
- Project Management
- Permitting Management
- Construction Management
- Construction Safety Management
- Cost Control
- Quality Assurance
- Interface Management
- Facility Management
- Location: Hünfeld
- Period: 2011-2012
- Owner: Wella Grundstücks- und Vermögensverwaltungs GmbH & Co. KG
- Contractor: Z-Bau, Empfertshausen
For the construction of a new, enlarged unloading containment pad for liquid raw materials, the existing unloading containment pad, which was no longer adequately sized, was completely demolished. The new facility was realized through the installation of liquid-tight concrete slabs to ensure groundwater protection, and the erection of foundations for the canopy structure. A sustainable approach was pursued for the canopy by reusing an existing structural system including the roof, which had been dismantled at another obsolete unloading containment pad in the production plant. This Re-Use concept for the structure contributed to resource conservation and the reduction of material input.