Watercourse Culverting with DN 1800 pipes
- Deliverables:
- Project Management
- Permitting Management
- Construction Management
- Construction Safety Management
- Cost Control
- Interface Management
- Location: Hünfeld
- Period: 2011-2012
- Owner: Wella Grundstücks- und Vermögensverwaltungs GmbH & Co. KG
- Contractor: Lohfink Baugesellschaft, Eiterfeld
To realize a production expansion and the laying of a fire service main, the culverting of the watercourse Weihersflößchen was necessary. The watercourse, which was already partially piped beneath a high-bay warehouse and ran through a fire pond, was culverted in the area of the pond with DN 1800 concrete pipes in close coordination with the Nature Conservation Authority and the Higher Water Authority. An inspection shaft was erected within the site. As an ecological compensation measure for the completed culverting, a compensatory area in the lower stream course of the Weihersflößchen was renatured. The renaturation encompassed the meandering of the watercourse and the creation of a new biotope through planting measures.