Installation of a Reinforced Concrete Mezzanine in a Production Building
- Deliverables:
- Permitting Management
- Construction Management
- Construction Safety Management
- Quality Assurance
- Interface Management
- Facility Management
- Location: Hünfeld
- Period: 2011-2012
- Owner: Wella Grundstücks- und Vermögensverwaltungs GmbH & Co. KG
- Contractor: Rützel Bau GmbH, Fulda
The installation of a new reinforced concrete mezzanine was realized within an existing production building to expand production capacity. Prior to this, the production area used as the making area (Making) had to be deconstructed and demolished to create the necessary space for the new structure. The reinforced concrete mezzanine was structurally integrated into the existing structural system. The entire construction project was carried out while maintaining continuous operation in the adjacent areas of the production building.