Conversion of a Microbiological S2 Laboratory
- Deliverables:
- Project Management
- Definition of Scope
- Design-Management
- Constructability Reviews
- Construction Management
- Construction Safety Management
- Interface Management
- Cost Control
- Quality Assurance
- Documentation Management
- Commissioning Management
- Location: Hünfeld
- Period: 2016
- Client: Wella Grundstücks- und Vermögensverwaltungs GmbH & Co. KG
- Contractor: Individual trade contracts
As part of the modernization of an existing biosafety level 2 (S2) biology laboratory, a new building was initially assessed as necessary, since increased sample volumes, extensive internal company standards and additional technical requirements could not be met by the existing laboratory. Through further needs analyses, a review of the relevant standards and the delineation of statutory requirements, a more economical solution was developed by expanding the floor area and adapting the existing microbiology laboratory. As a result, the new-build project costs, originally calculated in the single-digit million range, could be reduced to a mid six-figure amount for the conversion of the existing laboratory. The new floor plan ensures clear workflows and avoids cross-contamination. In addition, hygiene and GMP requirements were taken into account, air-conditioned work areas were created, and the contamination protection requirements were ensured through specific pressure conditions in the ventilation system. Phased implementation allowed the existing laboratory to remain in operation during the conversion work.